Washington, NC 27889,2280 W 5th ST
See all 56 photos
Washington, NC 27889,2280 W 5th ST
Washington, NC 27889,2280 W 5th ST
Washington, NC 27889,2280 W 5th ST
Washington, NC 27889,2280 W 5th ST
REQUEST A TOUR If you would like to see this home without being there in person, select the "Virtual Tour" option and your agent will contact you to discuss available opportunities.
In-PersonVirtual Tour
Tue
6
May
Wed
7
May
Thu
8
May
$ 225,000
Est. payment /mo
Save
Price Dropped by $14K

2280 W 5th ST Washington, NC 27889

3 Beds

1 Bath

1,390 SqFt


UPDATED:

Key Details

Property Type Single Family Home

Sub Type Single Family Residence

Listing Status Active

Purchase Type For Sale

Square Footage 1,390 sqft

Price per Sqft $161

Subdivision Beaufort Heights

MLS Listing ID 100491232

Style Wood Frame

Bedrooms 3

Full Baths 1

HOA Y/N No

Originating Board Hive MLS

Year Built 1947

Lot Size 0.580 Acres

Acres 0.58

Lot Dimensions 89 x 190 x 134 x 145

Property Sub-Type Single Family Residence

Property Description

This 1940's 3 bedroom/one full bath downstairs and 3 bedrooms/one full bath upstairs (upstairs not counted in sq.ft.) home is located on the outskirts of Washington, with a lovely front porch that greets you and a short drive to Greenville. Inside you'll find a cute kitchen with yellow checkerboard tile, stainless steel appliances with a new dishwasher. The downstairs has hardwood floors throughout, with three bedrooms that were converted into a successful in house daycare. The concept was an open classroom setting that can easily be converted back in three bedrooms. Upstairs is an additional 350 square feet of attic space that was turned into two bedrooms and a full bath, but not included in the original square footage because currently there is no central heat and air. The downstairs central heat and air was replaced within the last couple of years. The storage shed was refaced, the porch floor and railings were painted along with the outside of the home this past Summer. The home has a fenced-in play area. There is an extra lot next door available to be purchased separately. Fence railing matching the current fencing available for lot. Come see this cute southern home in Washington!

Location

State NC

County Beaufort

Community Beaufort Heights

Zoning Res

Direction Hwy 264 W/W 5th St from Washington. House is on the R. at tge corner of W. 5th and Queen Street.

Location Details Mainland

Rooms

Other Rooms Shed(s)

Basement None

Primary Bedroom Level Primary Living Area

Interior

Interior Features Master Downstairs

Heating Heat Pump, Electric, Forced Air

Cooling See Remarks

Fireplaces Type Gas Log

Fireplace Yes

Window Features Blinds

Appliance Refrigerator, Dishwasher, Cooktop - Gas

Laundry Hookup - Dryer, Laundry Closet, Washer Hookup

Exterior

Parking Features Additional Parking, Gravel, Off Street

Pool None

Utilities Available Natural Gas Connected

Waterfront Description None

Roof Type Shingle

Accessibility None

Porch Covered, Porch

Building

Lot Description Corner Lot

Story 1

Entry Level One and One Half

Foundation Brick/Mortar

Sewer Septic On Site

Water Municipal Water

New Construction No

Schools

Elementary Schools Eastern

Middle Schools P. S. Jones

High Schools Washington High School

Others

Tax ID 5667-81-0527

Acceptable Financing Cash, Conventional

Listing Terms Cash, Conventional


Hive MLS / (NCRMLS) / Cape Fear Realtors
Listed by The Rich Company
agent

Lindsey Lamica

Agent

+1(980) 622-1218

GET MORE INFORMATION

Name
Phone*
Message

Go tour this home

2280 W 5th ST